Unit of competency Outline
Information current as of
12/09/2026 9:21 AM AWST
12/09/2026 9:21 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install and set up grid connected photovoltaic power systems
Install and set up grid connected photovoltaic power systems
Unit of competency
National Code
UEENEEK026A
UEENEEK026A
State Code
W6398
W6398
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
17/11/2009
Original Release Date
08/11/2006
Nominal Hours
36
Field of Education
031399 - Electrical And Electronic Engineering And Technology, N.e.c.
Description
N/A
General notes
N/A
Elements and Performance Criteria
No information
No information
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8164 | UEENEEK026B | Install and set up grid connected photovoltaic power systems | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| W539 | UEE42009 | Certificate IV in Electrical - Photovoltaic Systems | Qualification |