Skill set Outline
Information current as of
14/09/2026 12:56 AM AWST
14/09/2026 12:56 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
RAC - Install, Commission, Service and Maintain Variable Refrigerant Flow Air Conditioning Systems
RAC - Install, Commission, Service and Maintain Variable Refrigerant Flow Air Conditioning Systems
Skill set
National Code
UEESS00184
UEESS00184
State Code
AE604
AE604
TGA Status
Replaced
Replaced
DTWD Status
Transition (Replaced)
Transition (Replaced)
National Endorsed, State Implementation and Classification
AQF Level
—
Field of Education
—
Skillset Type
National
Original TGA Release Date
14/10/2021
Current Release Date
14/10/2021
Current Release Number
1.00
Approved Date
07/02/2022
Nominal Hours
125
Duration
—
Releases
| Release Version | Release Date | TGA Status | DTWD Status |
|---|---|---|---|
| 1.00 | 14/10/2021 | Current | Replaced |
Description
This Skill Set is for persons who are required to install, commission, service and maintain variable refrigerant flow air conditioning systems.
Pathway Information
The units of competency in this Skill Set will contribute to the completion of relevant refrigeration and air conditioning Certificate III, Certificate IV, Diploma and Advanced Diploma qualifications from the UEE Electrotechnology Training Package.Entry RequirementsIt is essential that persons undertaking this Skill Set already hold the following qualification:- Certificate III in Air Conditioning and Refrigeration
Licensing / Regulatory Information
The skills and knowledge described in this unit require a current national Trainee or Full Refrigeration and Air Conditioning Refrigerant Handling Licence as it includes work on refrigeration and air conditioning equipment that carries the risk of a fluorocarbon refrigerant being emitted while decanting, manufacturing, installing, commissioning, servicing, maintaining or decommissioning activities are being carried out.
Target Group
This Skill Set is intended for persons who are required to install, commission, service and maintain variable refrigerant flow air conditioning systems
Suggested words for statement of attainment
This Skill Set from the UEE Electrotechnology Training Package meets the industry requirements for installing, commissioning, servicing and maintaining variable refrigerant flow air conditioning systems.
General notes
Schedule
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| OCA55 | UEECD0007 | Apply work health and safety regulations, codes and practices in the workplace | 18 | Unit of competency |
| OBZ98 | UEERA0051 | Install, commission, service and maintain air conditioning systems | 72 | Unit of competency |
| ODP05 | UEERA0097 | Install, commission, service and maintain variable refrigerant flow air conditioning systems | 35 | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AF313 | UEESS00220 | RAC - Install, Commission, Service and Maintain Variable Refrigerant Flow Air Conditioning Systems | Skill set |