Skill set Outline
Information current as of
14/09/2026 3:28 AM AWST
14/09/2026 3:28 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Telecommunications Linesworker HFC Skill Set
Telecommunications Linesworker HFC Skill Set
Skill set
National Code
ICTSS00093
ICTSS00093
State Code
AD980
AD980
TGA Status
Current
Current
DTWD Status
Approved
Approved
National Endorsed, State Implementation and Classification
AQF Level
—
Field of Education
—
Skillset Type
National
Original TGA Release Date
30/08/2019
Current Release Date
19/01/2021
Current Release Number
2.00
Approved Date
29/03/2021
Nominal Hours
250
Duration
1 Semester
Releases
| Release Version | Release Date | TGA Status | DTWD Status |
|---|---|---|---|
| 2.00 | 19/01/2021 | Current | Approved |
| 1.00 | 30/08/2019 | Replaced | Replaced |
Description
This skill set addresses the skills and knowledge required for TAP down installation of hybrid fibre coaxial (HFC) cable. Each unit of competency includes relevant work, health and safety awareness training. Other health, safety and environment requirements, relevant to the role specified in this skill set, may be stipulated as part of workplace requirements.
Pathway Information
This skill set provides credit towards the ICT20219 Certificate II in Telecommunications Network Build and Operation.
Licensing / Regulatory Information
Work functions in the occupational areas where this unit may be used are subject to regulatory requirements. Refer to the ICT Implementation Guide Companion Volume or the relevant regulator for details of licensing, legislative or certification requirements.
Target Group
This skill set is for entry level telecommunications workers.
Suggested words for statement of attainment
These units of competency meet industry requirements for TAP down installation of HFC cable.
General notes
Schedule
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| OBA75 | ICTCBL250 | Haul and fix aerial cable | 35 | Unit of competency |
| OBA69 | ICTCBL249 | Haul underground cable for installation and maintenance work | 35 | Unit of competency |
| OBA68 | ICTCBL251 | Install aerial and underground cable lead-ins | 25 | Unit of competency |
| OBA67 | ICTCBL252 | Joint and terminate coaxial cable | 60 | Unit of competency |
| AWE14 | ICTPMG201 | Prepare site for support installation | 60 | Unit of competency |
| OBA79 | ICTBWN306 | Use radio frequency measuring instruments | 35 | Unit of competency |
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AD715 | ICTSS00079 | Telecommunications Linesworker HFC Skill Set | Skill set |