Skill set Outline
Information current as of
14/09/2026 3:16 AM AWST
14/09/2026 3:16 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Tram or Light Rail Turnout Installation Skill Set
Tram or Light Rail Turnout Installation Skill Set
Skill set
National Code
TLISS00066
TLISS00066
State Code
AB673
AB673
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
National Endorsed, State Implementation and Classification
AQF Level
—
Field of Education
—
Skillset Type
National
Approved Date
—
Nominal Hours
20
Duration
1 Semester
Description
This skill set targets anyone who is required to install turnouts on a tram or light rail system.
Pathway Information
This skill set is to be undertaken in addition to the TLI22213 Certificate II in Tram or Light Rail Infrastructure and targets workers who will install turnouts.
Licensing / Regulatory Information
Readers should ensure that they have also read the part of the Training Package that outlines licensing and regulatory requirements.
Target Group
This is a skill set covering a role required to install turnouts on tram or light rail tracks.
Suggested words for statement of attainment
This competency from the TLI10 Transport and Logistics Training Package Version 3.0 meets the needs of the tram or light rail infrastructure industry. The competency is drawn from a nationally endorsed Training Package and provides the skills and knowledge for a person within the tram or light rail infrastructure environment required to install turnouts.
General notes
Schedule
No information
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AD233 | TLISS00147 | Tram or Light Rail Turnout Installation Skill Set | Skill set |