Module Outline
Information current as of
30/10/2026 7:07 PM AWST
30/10/2026 7:07 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Produce an engineering design for drainage pipes and culverts
Produce an engineering design for drainage pipes and culverts
Module
National Code
VU23952
VU23952
State Code
BB712
BB712
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
18/09/2026
Field of Education
030907 - Water And Sanitary Engineering
Nominal Hours
80
Description
This unit describes the performance outcomes, knowledge and skills required to apply principles of design for drainage pipes and culverts for an urban or rural road using appropriate drainage standards.
It requires the ability to apply the basic concepts in engineering hydrology to estimate flood flow magnitude and apply basic culvert and drainage design practices.
The unit of competency applies to a person working at paraprofessional level in a civil engineering environment where the design of roads is undertaken.
No licensing or certification requirements apply to this unit at the time of accreditation.
It requires the ability to apply the basic concepts in engineering hydrology to estimate flood flow magnitude and apply basic culvert and drainage design practices.
The unit of competency applies to a person working at paraprofessional level in a civil engineering environment where the design of roads is undertaken.
No licensing or certification requirements apply to this unit at the time of accreditation.
General notes
No information
No information
Elements and Performance Criteria
Identify drainage design requirements
- 1.1 Occupational health and safety/workplace health and safety (OHS/WHS) requirements and environmental requirements for a given work area are obtained and interpreted and followed
- 1.2 Safety hazards which have not previously been identified are documented and risk control measures devised and implemented in consultation with appropriate personnel
- 1.3 Drainage design requirements are identified from documentation, work requests and/or discussion with appropriate personnel
- 1.4 Appropriate personnel are consulted to ensure the work is co-ordinated effectively with others involved at the workplace
Access drainage design references
- 2.1 Resources and equipment needed for the task are obtained in accordance with workplace procedures and checked for correct operation
- 2.2 On site reconnaissance to gather surveying data, measurements, photographs and other required information for the drainage design project is completed
- 2.3 Decisions for dealing with unexpected situations are made from discussions with appropriate personnel, job specifications and workplace procedures
Prepare the design
- 3.1 Using the concepts in engineering hydrology to estimate flood flow magnitude and relevant Australian standards, a culvert with underground drainage network is developed
- 3.2 Design is reviewed with appropriate personnel and amended as required to provide the optimum drainage solution
Present and store final design
- 4.1 File naming conventions, storage and back up processes are followed in accordance with workplace procedure
- 4.2 Drawings are outputted to printer/plotters or issued as PDF files
- 4.3 Final design is presented to appropriate personnel in accordance with workplace procedures
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| AZ207 | VU22547 | Produce an engineering design for drainage pipes and culverts | Module |
Associated Qual/Courses
| State Code | National Code | Title | Type |
|---|---|---|---|
| BHW56 | 52950WA | Advanced Diploma of Civil and Structural Engineering | Accredited course |